Browse Items (2116 total)

20180215-RecarpetingPS(19).JPG
Old carpet remains inside the Archive Room while new carpet surrounds the outside.

20180215-RecarpetingPS(23).JPG
A view from the main entrance shows new carpet covering the floor throughout the center of the library.

20180215-RecarpetingWorkroom(13).JPG
A view from the north doorway to the circulation desk shows the staff workroom before re-carpeting.

20180215-RecarpetingWorkroom(15).JPG
Library staff member Molly Countryman walks through the check-in area before it is re-carpeted. The check-in desk has been relocated, bookshelves have been cleared and temporary moving shelves are used to help move items around during the project.

20180215-RecarpetingWorkroom(16).JPG
Items from Library Director Eric Melton's office sit on a temporary moving shelf outside of his window in the Youth Services area. A sign on the shelf reads "ERIC office."

20180215-RecarpetingYS(1).JPG
New carpet covers the floor in the Youth Services staff workroom.

20180215-RecarpetingYS(3).JPG
New carpet covers the floor in the Youth Computer Lounge.

20180215-RecarpetingYS(20).JPG
New carpet covers the floor in the Story Time Room.

20180215-RecarpetingYS(22).JPG
New carpet covers the floor on the North side of the library. A pallet of carpet squares sits outside of the Archive Room.

20180216-RecarpetingPS(1).JPG
A view from the main entrance shows new carpet covering the floor throughout the center of the library.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2