Browse Items (2116 total)

20180222-RecarpetingLarge(4).JPG
A small patch of old carpet remains under stacked chairs and tables from the meeting room.

20180222-RecarpetingLarge(1).JPG
The floor is bare in the West Meeting Room after the old carpet has been removed and stacked on a pallet.

20180220-RecarpetingWorkroom(23).JPG
A study room has been temporarily converted into a staff workspace during the re-carpeting project.

20180220-RecarpetingWorkroom(22).JPG
Maisy the hamster relaxes in her house after the busy re-carpeting project around the Circulation desk. Library staff member Lori Elrick works in the background.

20180220-RecarpetingWorkroom(20).JPG
Library staff member Missy Schwebach works at the temporary Technical Services workspace in the Story Time Room.

20180220-RecarpetingWorkroom(19).JPG
Library staff member Elizabeth Stevens works at a computer in a study room during the re-carpeting project.

20180220-RecarpetingWorkroom(18).JPG
Library staff member Blaine Riesberg poses for a photo with a big smile during the re-carpeting project.

20180220-RecarpetingWorkroom(17).JPG
Library staff member Denise Ramsey works on top of the new carpet behind the Circulation desk.

20180220-RecarpetingWorkroom(15).JPG
Displaced office furniture and supplies can be seen on top of the new carpet around the Technical Services processing counter.

20180220-RecarpetingWorkroom(13).JPG
Library staff members Elizabeth Stevens (right) and Megan Sockness (left) eat lunch around a bench stacked on the table during the re-carpeting project. Old carpet still covers the floor in the break room.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2