Browse Items (2116 total)

20180207-RecarpetingPS(16).JPG
A worker poses for a photo with a carpet square that has "# 4795" written on it.

20180207-RecarpetingPS(20).JPG
A close-up of a bucket shows the green adhesive used for the re-carpeting project.

20180207-RecarpetingPS(21).JPG
Old carpet scraps sit in a pile on top of a box.

20180207-RecarpetingPS(22).JPG
A pile of odds and ends including plastic, carpet and adhesive lay on a box during the re-carpeting project.

20180207-RecarpetingPS(23).JPG
Red plastic tape that reads "DANGER DO NOT ENTER" blocks off an area being re-carpeted.

20180207-RecarpetingYS(1).JPG
New carpet squares are being added to cover the bare floor around the Youth Computer Lounge.

20180208-RecarpetingCirc(3).JPG
A before photo shows the carpet behind the Circulation desk before re-carpeting.

20180208-RecarpetingCommons(4).JPG
The JPL Book Bike is temporarily parked in the commons while the carpet is replaced in its usual parking space.

20180208-RecarpetingPS(1).JPG
Many pieces of furniture are stacked in the center of the library on top of new carpet while other areas are being re-carpeted.

20180208-RecarpetingPS(2).JPG
A pallet of new carpet squares rests next to large boxes on top of an area with old carpet.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2